Building a new house is exciting. There are lots of new things. It’s a whole new level of experience to be taken care of by the homeowner and home construction companies. The house can be built from the start to the end, or some parts get a new look. The homeowners watch all of it. As the drywall is made, they visualize themselves and imagine what they will do. They plan the settings and set things perfectly. They look after the design aspect.
The professionals look after the needs and tastes of owners. They help the homeowners prepare for and outline the key tasks. Every home building process varies from region to region. If you need a reliable builder to help you with your needs, ask them about specific policies and procedures.
Make an appointment with a home building company to let you walk through the home. You will learn a lot of things from them. The usual steps in the home construction business are preparing a construction site and pouring the foundation. The other steps are mentioned further. The builder needs a permit to work. The builder has to get the designs approved before shovelling the ground. All things need permits, from zoning to grading to the septic systems, electrical work, and plumbing.
Site Leveling
The construction crew performs the site levelling task using backhoes and bulldozers. They clear the debris, rocks and trees from the area.
Footings
The footings are installed to support the ground system. If there will be a well, it needs to be dug at the point. If there is a basement, digging is done. After pouring the concrete into the holes and trenches, it needs time to cure. There will be no activity on the site.
Waterproofing
A waterproofing membrane is applied to the foundation walls when the concrete dries up. The drainage, sewer systems, water taps, and plumbing are installed. The backfill excavated dirt gets filled around the foundation wall. The foundation may take some time to get settled. It is an important part. That can take a month or more.
Electrical and Plumbing Fixtures
At this stage, the pipes, water supply lines, bathtubs, shower units, wires, sewer lines, vents, ductwork for the HVAC system, HVAC vent pipes, electrical wiring and receptacles are fitted. The sidings and roofing get installed once the shell finishes up. The electrical and plumbing professionals install pipes and wires through the ceilings, walls and floors. The sewer lines and vents are dug. The heating, ventilation, and air conditioning system ducts get installed. After the roofing work, the receptacles for outlets, lights, and switches are installed. The HVAC ducts and plumbing get installed before wiring.
Insulation
Insulation offers a comfortable indoor climate. It significantly improves the home’s energy efficiency. The thermal performance indicates how well the material resists heat. They match the exterior walls, attics and all other regions. Fibreglass and mineral wool batts get installed on the walls, floors, crawl spaces, attics, basements and ceilings.
Interior Fixtures
Drywall gets hung on the interior walls and taped. The paint is applied with the exterior finishes installed.
Doors, Windowsills and Decorative Trims Installation
The baseboards, door casings, windowsills, interior doors, stair balusters and other decorative trims get installed. The exterior, the driveway, walkways, and patios are created at this stage. They wait until the driveway gets cleared. The builders make the driveway.
Surface Flooring and Countertops
The ceramic tile, vinyl and wood flooring get installed with countertops. The exterior finish grading is completed with proper drainage away from home. The yard for landscaping fits perfectly.
Final Inspection
The builder will show the homeowner the new home. They will guide the on the features and several systems and components. They will explain the maintenance and upkeeps, the warranties and procedures. They will do an excellent walk-through. They will look for mistakes and perform improvements. They are very attentive and observant at this moment. They will examine the fixtures, countertops, walls, and floors for damage. Any dispute can arise when a homeowner discovers an issue later. It better is for the builder to find and rectify the errors.
All the above are the basic steps followed in a home building process. But some factors affect the construction of a house like weather, availability of material, contractors delays, site conditions, and inspections.
- Weather plays an integral part in the home construction timeline. In mild weather, things can turn out to be smooth.
- The more dangerous the site conditions are, the more difficult it’ll be for the workers to build a house. The land must be free from issues that can impact the foundation later.
- The materials’ unavailability can delay construction.
- The contractors determine when to start a project. Before that, you need to find the right one, which can take time but will pay off in the long run.
- Inspections are necessary. Only after they are conducted the homeowner gets the satisfaction that the house is made solid.